Server Sizing Guide: What 20, 50 and 100 Users Need in 2026

LinkedIn Facebook

"How big a server do we need?" is the question we are asked most, and the honest answer is that headcount is only the starting point. Twenty people running an ERP and CAD need more than fifty people who live in Microsoft 365. This guide gives you the sizing rules we use, worked through for 20, 50 and 100 users, with three example builds priced from refurbished Dell and HPE stock in Qatar, and the licensing that goes with them.

The short answer

20 users: one host with 16 to 20 cores, 64 GB, an SSD mirror and SAS bulk storage, about QAR 4,000. 50 users: two hosts with 128 GB each plus a backup server, about QAR 18,500. 100 users: a three-node cluster with 256 GB per node, 10GbE and a dedicated backup server, about QAR 55,000. Size memory first, then storage, then cores; add 30 percent for three years of growth.

See the sizing rules ↓

20 users

One host
Dell PowerEdge T440 tower server for a 20 user office

Tower or 1U, 4 VMs

1 × Xeon Gold 6138 20C · 64 GB · 2 × 480 GB SSD mirror + 8 TB SAS · Proxmox or Hyper-V

Typical VMs

  • Domain controller with DNS and DHCP, file and print server
  • One line-of-business application with its database
  • Backup to a NAS or a second disk set, replicated off-site
Most common request

50 users

Two hosts + backup
Two 1U servers for a 50 user office

Two R640 hosts, 8 VMs with HA

2 × (2 × Gold 6138, 128 GB, 2 × 960 GB SAS SSD + 2.4 TB SAS) · R630 backup server · 10GbE between hosts

Typical VMs

  • Two domain controllers, file server, print, RDS or app server
  • ERP or accounting with SQL Server on its own VM and SSD
  • Monitoring, a Linux utility box, Proxmox Backup Server or Veeam on the third machine

100 users

3-node cluster
Three 2U servers forming a cluster for a 100 user business

Three DL380 Gen10 nodes, 12 to 16 VMs, N+1

3 × (2 × Gold 6140, 256 GB, 4 × 1.92 TB SSD) · Ceph or ZFS replication · R730xd backup · 10GbE switch

Typical VMs

  • Everything in the 50-user plan, plus RDS farm, intranet, CCTV or ERP test
  • Any node can fail with no service loss; maintenance in working hours
  • Backup to a separate server with 19 TB raw and immutability

Server sizing went out of fashion when everyone assumed the cloud would take the workload. In 2026 it is back, because Qatar businesses are repatriating file servers, ERP databases and CCTV from cloud bills that grew faster than their headcount, and because a refurbished Dell or HPE host with forty cores costs less than a quarter's worth of the cloud instances it replaces. The question is how much to buy. Too little and the ERP crawls at month-end; too much and you have paid for cores you will never use and for Windows licences that count every one of them.

This guide gives the rules of thumb we apply when we size a server for a customer, then works them through for three headcounts: a 20-person office, a 50-person company and a 100-person business with multiple departments. Each tier has an example build priced from our stock in November 2026, a virtual machine plan, the licences it needs and the upgrade path to the next tier. The rules are for general business workloads: Active Directory, files, print, an accounting or ERP system, a line-of-business application, maybe Remote Desktop. Specialised workloads, GPU inference, large databases, video analytics, are sized differently and we point to the right guide where they come up.

The sizing rules

Size in this order: memory, then storage, then cores, then network. Memory is the resource that runs out first in a virtualised office server, storage is the one that is hardest to change later, and cores are the one that is almost always oversupplied on second-hand hardware. The table gives per-workload starting points for a single virtual machine; the per-user figures are for ordinary office use and should be doubled for engineering, media or data-heavy teams.

Workload (one VM) vCPU RAM Storage Notes
Infrastructure
Domain controller, DNS, DHCP 2 4 GB 80 GB SSD Two DCs from 50 users; never on the same physical host
File server 2 to 4 8 to 16 GB 20 to 50 GB per user, SAS or SATA Add SSD cache or tier for CAD and design teams; enable deduplication
Print server 2 4 GB 60 GB Can share the file server VM under 50 users
Backup server (PBS or Veeam) 4 8 to 16 GB 1.5 to 2 × primary data Separate physical machine; immutable repository
Monitoring, utilities, Linux services 2 2 to 4 GB 40 GB LXC containers on Proxmox use a fraction of this
Applications
Accounting or ERP application server 4 8 to 16 GB 100 GB SSD Vendor minimums are usually understated; add 50 percent
SQL Server for ERP 4 to 8 16 to 32 GB 200 to 500 GB SSD, separate log volume 1:1 vCPU to core; licence by vCPU, so keep it tight
Remote Desktop session host 1 per 5 users 4 GB + 2 GB per user 100 GB + profiles Max 25 to 30 users per host; RDS CAL per user
Intranet, CRM, web application 2 to 4 8 GB 100 GB PHP or .NET apps are light; their databases are not
CCTV recording 4 to 8 16 GB See our CCTV storage guide Separate host or NVR; do not mix with business VMs
Per-user and host rules
Office user (files, email in M365, ERP client) 0.1 to 0.2 0.5 to 1 GB 20 to 50 GB 10 to 30 IOPS per active user
Power user (CAD, BIM, video, analytics) 0.3 to 0.5 1 to 2 GB 100 to 500 GB SSD tier and 10GbE to the file server
Hypervisor overhead per host 2 cores 4 GB, 8 to 16 GB with ZFS 2 × SSD mirror for boot Proxmox ZFS ARC defaults to half of RAM; cap it
Consolidation ratio 3 to 4 vCPU per core No overcommit 20 percent free 1:1 for SQL and RDS; growth 30 percent over 3 years

Three rules override the table. First, never overcommit memory: the sum of VM RAM plus hypervisor overhead must fit in physical RAM with 10 percent spare, because memory ballooning and swapping are what make a server feel slow. Second, for availability, size for N+1: in a two-host setup each host must be able to run every VM alone; in a three-node cluster any two nodes must. Third, cores are cheap, licences are not: a refurbished Xeon Gold 6138 adds 20 cores for QAR 150, but Windows Server 2025 Standard licenses 16 cores for about QAR 4,300 and counts every core in the host, so match the core count to what Windows will license and spend the surplus on Linux VMs and containers.

Sized totals by headcount, general office workload

What 20, 50 and 100 users need, before growth headroom

Virtual machines and vCPU

20
VMs4
vCPU16
50
VMs8
vCPU36
100
VMs16
vCPU72

Memory GB, VMs + hypervisor

20
VM RAM50
Host RAM64
50
VM RAM104
Host RAM (each of 2)128
100
VM RAM208
Host RAM (each of 3)256

Storage TB usable

20
SSD tier0.45
Bulk4
50
SSD tier0.9
Bulk6
100
SSD tier5.8
Bulk12

Backup and network

20
Backup TB4
Uplink1GbE
50
Backup TB7
Uplink10GbE
100
Backup TB19
Uplink10GbE
Virtual machine demandPhysical provision in the example build

Demand figures sum the VM plans in the three builds below; provision figures are what the example hardware supplies. Storage is usable after mirroring or RAID; backup capacity is raw with 30-day retention and deduplication assumed.

Memory and backup capacity scale faster than cores. The 100-user cluster has four and a half times the RAM of the 20-user host but, at 108 physical cores against 20, more cores than it will ever use, because three nodes are needed for availability rather than compute.

Three example builds from stock

The builds below use refurbished Dell and HPE hardware we hold in Doha, priced in November 2026. Each is a starting point we have deployed in some form; your application vendor's requirements, your data volume and your appetite for downtime move the numbers. Prices are hardware only; licences and services follow in the licensing section.

Dell PowerEdge T440 tower server, the 20 user build

20 users: one host, four VMsDell PowerEdge T440 tower or R640 1U · Proxmox VE or Windows Server 2025 Hyper-V · about QAR 4,000

Single host

A 20-person office with email in Microsoft 365 needs a domain controller, a file and print server, one application server (accounting, HR, a document system) and a backup target. That is four VMs, about 16 vCPU and 50 GB of RAM, which a single two-socket-capable host with one 20-core processor and 64 GB carries with room to spare. We build it on a PowerEdge T440 tower when there is no rack, because it is quiet enough for a back office and takes eight 3.5-inch drives, or on an R640 when there is. Storage is two 480 GB enterprise SSDs mirrored for the hypervisor and the application VM, and the T440's 8 TB of SAS in RAID 10 for files and local backup. The compromise is availability: a single host means planned downtime for patching and a day or two of outage if the motherboard fails, which is acceptable at this size if the backup is off-site and tested.

Host

Dell PowerEdge T440, 1 × Xeon Gold 6138 20C, 24 GB, 8 TB SAS, PERC H330 · QAR 2,950

Add

2 × 16 GB DDR4 RDIMM (QAR 560) to 56 GB; or 2 × 32 GB (QAR 1,240) to 88 GB · 2 × Intel DC 480 GB SSD (QAR 460)

VM plan

DC01 (2 vCPU, 4 GB) · FILES (4, 16) · APP + DB (4, 16) · BACKUP or utility (2, 4) · 12 vCPU, 40 GB

Network and power

Onboard 2 × 1GbE, bonded · FortiGate 40F QAR 470 · 1.5 kVA line-interactive UPS, about QAR 1,200

Hardware total

About QAR 4,000 server; QAR 5,700 with firewall and UPS

Dell PowerEdge T440 inside with side panel removed showing CPU, DIMM slots and cabling
T440 inside: one or two Xeon Scalable, 16 DIMM slots, room for a second PSU and GPU
Dell PowerEdge T440 rear with redundant power supplies and PCIe slots
T440 rear: two hot-plug PSUs, five PCIe slots, iDRAC port

Right-sized when

  • Email, calendars and chat are in Microsoft 365 or Google Workspace
  • One business application, under 50 GB of database
  • Downtime of a working day is survivable with a tested backup
  • Nobody needs Remote Desktop or GPU acceleration
  • Growth to 30 users is expected; beyond that, go to the 50-user design

Undersized when

  • CAD, BIM or video teams: add an SSD tier and 10GbE to the file server
  • On-premises Exchange or a second heavy application: move to two sockets and 128 GB
  • RDS for remote staff: a session host for 20 users wants 8 vCPU and 48 GB on its own
  • CCTV recording: put it on its own NVR or server, never with the business VMs
  • Compliance requires no single point of failure: that is the 50-user design
Two rack servers representing the 50 user build

50 users: two hosts and a backup server2 × Dell PowerEdge R640 + R630 backup · Proxmox VE with ZFS replication and HA, or Hyper-V with a shared array · about QAR 18,500

High availability

At fifty users the business has departments, an ERP or accounting system with a real database, a second domain controller, and a cost to downtime that justifies a second host. The design we deploy most often is two PowerEdge R640s, each with two Xeon Gold 6138 (40 cores) and 128 GB, running Proxmox with ZFS on a mirrored pair of 960 GB SAS SSDs per host and the supplied 2.4 TB of SAS for bulk data. ZFS replication every few minutes plus Proxmox HA means a host failure restarts the VMs on the survivor within minutes; a third machine, a refurbished R630 with four 2.4 TB drives, runs Proxmox Backup Server with a 7 TB repository and a QDevice vote for quorum. The eight-VM plan uses about 36 vCPU and 104 GB, so either host can carry everything alone. Hyper-V works on the same hardware with a shared iSCSI array in place of ZFS replication, at the cost of the array.

Hosts (× 2)

R640, 2 × Gold 6138 40C, 24 GB, 2.4 TB SAS · QAR 2,626 each · + 4 × 32 GB DDR4-2933 (QAR 3,280) · + 2 × 960 GB SAS SSD (QAR 1,130)

Backup server

R630 barebone QAR 1,450 · E5-2620 v4 QAR 65 · 2 × 16 GB QAR 560 · 4 × 2.4 TB 10K SAS QAR 1,680 · about QAR 3,755

VM plan

DC01, DC02 (2, 4 each) · FILES (4, 16) · PRINT (2, 4) · ERP-APP (4, 16) · ERP-SQL (6, 32) · RDS or INTRANET (8, 24) · UTIL (2, 4) · 30 vCPU, 104 GB

Network

2 × Broadcom 57416 10GbE RJ45 NIC (QAR 640) direct host-to-host for replication; 1GbE to the office switch

Hardware total

About QAR 18,500 for hosts, memory, SSDs, backup server and NICs

Dell PowerEdge R640 inside with two heatsinks, 24 DIMM slots and fans
R640 inside: two sockets, 24 DIMM slots, eight fans; 128 GB is four modules
Dell PowerEdge R640 rear with 1100 W power supplies and four 1GbE ports
R640 rear: two 1100 W PSUs, rNDC with four 1GbE, two risers for the 10GbE cards
Dell PowerEdge R630 8SFF front
R630 backup server: eight 2.5-inch bays and DVD, the previous generation at QAR 1,450
Dell PowerEdge R630 rear with 750 W power supplies
R630 rear: two 750 W PSUs, two PCIe slots, iDRAC8

Right-sized when

  • ERP or accounting with SQL Server up to about 200 GB and 50 concurrent users
  • A host can be down for a few minutes during failover, not hours
  • File data under 2 TB active, with a third copy on the backup server
  • RDS for up to 20 remote or thin-client users on one session host
  • Growth to 70 or 80 users by adding memory to 256 GB per host

Undersized when

  • Zero-downtime failover is required: ZFS replication loses the last interval; use Ceph or a shared array in the 100-user design
  • File data over 5 TB: swap the R640s for R740xd nodes with 24 bays
  • Two or more heavy databases: give SQL its own NVMe mirror and 64 GB
  • More than 25 RDS users: add a second session host and a broker
  • Windows licensing on 40-core hosts is expensive; consider 2 × Gold 6126 12C hosts if everything is Windows
Three HPE ProLiant DL380 Gen10 24SFF nodes, the 100 user cluster

100 users: three-node cluster with 10GbE3 × HPE ProLiant DL380 Gen10 + R730xd backup · Proxmox VE with Ceph, or Hyper-V with Storage Spaces Direct · about QAR 55,000

N+1 cluster

A hundred users means a dozen or more VMs, several of them heavy, and a business that cannot wait for a failed host to be rebuilt. Three nodes are the minimum for a quorum and for hyper-converged storage, and they let you take any node down for maintenance in working hours. The build uses three DL380 Gen10 with two Gold 6140 each (36 cores), 256 GB and four 1.92 TB enterprise SSDs per node, pooled by Ceph with three-way replication for about 5.8 TB of usable all-flash storage, with bulk data on 2.4 TB SAS per node or a separate NAS. A fourth machine, an R730xd with eight 2.4 TB drives, runs the backup repository with 19 TB raw and immutable snapshots. 10GbE is not optional here: Ceph replication and live migration saturate 1GbE, so the three nodes and the backup server share a 10GbE switch with two links each. The same hardware runs Hyper-V with Storage Spaces Direct if the estate is Windows and the licensing is already Datacenter. The VM plan is about 72 vCPU and 208 GB; with one node down the remaining two carry it with 25 percent spare.

Nodes (× 3)

DL380 Gen10, 2 × Gold 6140 36C, 24 GB, 2.4 TB SAS, P408i-a · QAR 3,800 each · + 8 × 32 GB (QAR 6,560) · + 4 × 1.92 TB SATA SSD (QAR 4,200)

Backup server

R730xd 24 SFF QAR 2,200 · 2 × E5-2680 v4 QAR 440 · 4 × 16 GB QAR 1,120 · 8 × 2.4 TB SAS QAR 3,360 · about QAR 7,100

VM plan

2 DCs · FILES (4, 32) · PRINT · ERP-APP (6, 24) · ERP-SQL (8, 64) · 2 × RDS hosts (8, 48 each) · INTRANET/CRM (4, 16) · DEV/TEST (4, 16) · MONITORING · 2 × LINUX services · 72 vCPU, 208 GB

Network

24-port 10GbE SFP+ switch, refurbished, about QAR 3,000 · 4 × dual-port 10GbE NICs QAR 1,300 · transceivers and DACs

Hardware total

About QAR 55,000 for nodes, memory, SSDs, backup server and network; UPS separate

HPE ProLiant DL380 Gen10 inside with two CPUs, 24 DIMM slots and six fans
DL380 Gen10 inside: two Gold 6140, 24 DIMM slots for 256 GB, six hot-plug fans
HPE ProLiant DL380 Gen10 rear with 800 W power supplies
DL380 Gen10 rear: two 800 W Flex Slot PSUs, three riser cages, FlexibleLOM for 10GbE
Dell PowerEdge R730xd 24SFF front
R730xd backup server: 24 bays for the 19 TB repository
Dell PowerEdge R730xd inside
R730xd inside: 13G board with two E5-2680 v4, the backup target that costs QAR 7,100 built

Right-sized when

  • Several heavy applications: ERP, RDS farm, intranet, test environment
  • Downtime costs real money and a node failure must be invisible to staff
  • All-flash primary storage and 10GbE are expected by the applications
  • Capacity for 130 to 150 users by adding memory and drives, not nodes
  • A platform the IT team will grow into for five years

Undersized when

  • Databases over 1 TB or analytics: dedicated NVMe nodes, see our Xeon vs EPYC guide for 64-core hosts
  • GPU workloads or VDI with vGPU: an R740 GPU node, see our GPU server guide
  • Over 10 TB of active file data: a dedicated TrueNAS or StoreEasy filer on 10GbE
  • Multi-site: a second cluster or at least a replication target at the DR site
  • CCTV at scale: separate recording servers; see the CCTV storage guide

Licensing: the part that scales with cores

Hardware is the smaller half of the budget once Windows is involved. Windows Server 2025 is licensed per physical core in 16-core packs at about QAR 4,300 (Standard, USD 1,176) or QAR 24,600 (Datacenter, USD 6,771) list, with a minimum of 16 cores per server and 8 per processor, plus a client access licence for every user at roughly QAR 180, and an RDS CAL at roughly QAR 500 for Remote Desktop users. Standard covers two Windows VMs per fully licensed host and can be stacked; Datacenter covers unlimited VMs. Proxmox and Linux VMs cost nothing; the choice of hypervisor is covered in our VMware alternatives and Proxmox on refurbished servers guides, and the Windows Server 2025 changes in Windows Server 2022 vs 2025.

Three-year cost, hardware vs Windows licences, QAR, list prices

Where the money goes at each tier, Proxmox host with Windows guests

20 users: hardwareT440 host, memory, SSDs, firewall, UPS
QAR 5,700one host
20 users: Windows1 × Standard 16 core (20 cores needs 2 packs), 20 CALs
QAR 12,2002 Windows VMs
50 users: hardware2 × R640, backup server, 10GbE NICs
QAR 18,500plus UPS
50 users: Windows2 hosts × 40 cores × 6 VMs: 9 Standard packs each, 50 CALs, 20 RDS CALs
QAR 96,000or 2 × Datacenter: QAR 167,000
50 users: Windows, 24-core hostsSame plan on 2 × Gold 6126 12C hosts: 6 packs each
QAR 70,400QAR 25,600 saved by fewer cores
100 users: hardware3 × DL380 Gen10, backup server, 10GbE
QAR 55,000plus UPS
100 users: Windows3 × Datacenter for 36 cores (3 packs each), 100 CALs, 40 RDS CALs
QAR 260,000unlimited Windows VMs on all nodes

Microsoft list prices at USD 3.64 to the riyal: Standard USD 1,176 and Datacenter USD 6,771 per 16 cores; CALs estimated at QAR 180 and RDS CALs at QAR 500 from reseller pricing. Volume licensing, CSP subscriptions and existing agreements change the totals. Proxmox VE subscriptions (optional) are EUR 120 to 1,100 per socket per year.

From 50 users upward the Windows bill exceeds the hardware, and it is driven by the core count of the hosts, not by the users. That is why the 50-user build offers a 24-core variant, and why a 100-user cluster should run every service that can be Linux on Linux before buying Datacenter for three nodes.

Two ways to cut the licence line without cutting capacity. Run everything that can be Linux as Linux: monitoring, intranet, file sharing for Mac and Linux clients, backup, reverse proxies and containers cost nothing on Proxmox. And right-size the processors to Windows, not to the chassis: a pair of 12-core Gold 6126 chips licenses at 32 cores instead of 48 and loses nothing a 50-user office will notice, and a single 16-core processor halves it again. Our Xeon vs EPYC guide covers per-core licensing in more depth.

Storage: the decision you cannot easily undo

Cores and memory can be added in an afternoon. Storage layout is set when you choose the chassis and the controller mode, so get it right first. The pattern that works at every tier is two tiers: a mirrored SSD pair, or four SSDs in RAID 10 or a Ceph pool, for the hypervisor, databases and application VMs, and 10K SAS or 7.2K drives for files, archives and local backup. For 20 users a T440 with eight 3.5-inch bays does both; for 50 users the R640's ten 2.5-inch bays hold two SSDs and the rest SAS; for 100 users the DL380's 16 to 24 bays make an all-flash Ceph pool practical. The NVMe vs SAS vs SATA guide helps pick the SSD class and the endurance guide explains why a 1 DWPD read-intensive drive is enough for office VMs.

Controller mode follows the hypervisor. Proxmox with ZFS or Ceph wants the drives presented raw, which on an R640 means an HBA330 or the PERC in HBA mode and on a DL380 Gen10 means the P408i-a's HBA mode or mixed mode; Hyper-V with Storage Spaces Direct has the same requirement. Hyper-V on a single host, or any design using a hardware RAID volume, keeps the PERC or Smart Array in RAID mode with its cache battery checked. See Smart Array vs PERC vs HBA mode and RAID levels explained. Plan the file server at 20 to 50 GB per user with deduplication on, double it for design teams, and keep 20 percent free: a full volume is the most common cause of the Monday morning call.

Network and power

At 20 users the onboard gigabit ports bonded to a managed switch are enough; a FortiGate 40F at QAR 470 provides the edge. From 50 users, 10GbE between the hosts and the backup server is what makes replication, live migration and backup windows fit in a night; two dual-port 10GbE cards and a direct cable cost QAR 640 and need no switch. At 100 users a 10GbE switch becomes the backbone, with the file server and backup target on it and the office still on gigabit; our 10GbE to 100GbE guide and switch buying guide cover the options. Power is the other sizing item people forget: a single host with one 750 W supply draws 200 to 300 W in practice and wants a 1.5 kVA UPS; two R640s and a backup server want 3 kVA; a three-node cluster with a 10GbE switch wants 5 kVA or two 3 kVA units on separate feeds. Size it with the UPS sizing guide, and in Qatar give the room its own cooling budget, see server room cooling.

Hosts for the three builds

All servers →
Dell PowerEdge T440 tower server with Xeon Gold 6138
20 users

Dell PowerEdge T440, Xeon Gold 6138 20C, 24 GB, 8 TB SAS, H330

View server →

Dell PowerEdge R640 with two Xeon Gold 6138
50 users

Dell PowerEdge R640 2 × Xeon Gold 6138 40C, 24 GB, 2.4 TB SAS

View server →

HPE ProLiant DL380 Gen10 with two Xeon Gold 6140
100 users

HPE ProLiant DL380 Gen10 2 × Xeon Gold 6140 36C, 24 GB, 2.4 TB SAS, P408i-a

View server →

Memory, SSDs and backup drives

Server memory →
Samsung 32GB DDR4-2933 ECC RDIMM
RDIMM

Samsung 32 GB DDR4-2933 ECC RDIMM

View memory →

Dell Toshiba 960GB SAS SSD with caddy
SSD tier

Dell Toshiba PX05SVB 960 GB SAS 12 Gb/s SSD with caddy

View SSD →

Dell 2.4TB 10K SAS enterprise hard drive
Bulk and backup

Dell 2.4 TB 10K SAS 12 Gb/s 2.5" Enterprise HDD

View drive →

Buy memory for today's VMs plus 30 percent, storage for three years of data, and cores for the licences you are willing to pay for. Everything else on a refurbished server is cheap to add later.

Adjusting for your workload

Email on premises (Exchange) instead of Microsoft 365

Add a VM with 8 vCPU and 32 GB per 100 mailboxes, 2 GB of SSD per mailbox, and a second one from 50 users for a DAG. Most Qatar businesses are better served by moving mail to the cloud and sizing the server for the rest.

+1 host tier

Engineering, architecture, media (CAD, BIM, Revit, video)

Double per-user storage, add an SSD tier for active projects, put the file server on 10GbE, and consider a workstation strategy rather than RDS. See our workstation guides for the client side.

Storage and network

Remote Desktop for most staff

One session host per 20 to 25 users at 8 vCPU and 48 to 64 GB, a broker from two hosts, RDS CALs, and SSD for profiles. This is the workload that pushes 50 users into the 100-user hardware.

RAM heavy

ERP with a large database (over 200 GB) or many concurrent users

SQL on its own VM at 1:1 vCPU to core, 64 GB and up, NVMe mirror for data and log, and SQL Server Standard licensed per vCPU. Check the vendor's sizing sheet and add 50 percent.

SSD and licences

CCTV, access control, building systems

Separate recording server or NVR sized by camera count and retention, on its own VLAN; see the CCTV storage guide. Never on the business cluster.

Separate host

AI, analytics, GPU

A dedicated R740 or DL380 Gen10 GPU node with one or two cards; the business cluster stays as sized. See GPU workloads on refurbished servers.

Separate host

Two sites, or a DR requirement

Replicate to a single host at the second site sized for the critical VMs only (usually a third of the plan), with PBS or Veeam replication over the WAN. See the 3-2-1 backup strategy.

+1 host

Mostly Linux, DevOps, containers

LXC and Docker consolidate far better than Windows VMs; the same hardware carries two to three times the services. Keep the licensing section in mind only for the Windows remainder.

Fewer cores needed

Growing from one tier to the next

✓20 to 50 users

Keep the T440 or R640 as the backup server or the second domain controller host; buy two R640s with 128 GB; migrate VMs with a Proxmox backup and restore or a Hyper-V export. The SSDs and SAS drives move across. Typical cost of the step: QAR 15,000.

!50 to 100 users

Add a third node matching the two R640s and move to Ceph or a shared array, or replace all three with 2U nodes if storage is the constraint. Upgrade to a 10GbE switch and a larger backup server. Windows licensing may change from Standard to Datacenter; plan it before buying cores.

×What does not scale

A single host beyond about 30 users or beyond one heavy application; 1GbE between hosts once replication or Ceph is involved; a PERC in RAID mode when you want ZFS or Ceph; a backup server smaller than 1.5 times primary data; a UPS sized for the first host only.

Sizing for 2027 and beyond

Hardware

15G and Gen10 Plus arrive

2026 to 2027

Ice Lake hosts with PCIe 4.0 NVMe and DDR4-3200 replace 14G as the value tier; the sizing rules do not change, the per-core price falls

Memory

128 GB is the new 64

RAM per host

32 GB DDR4-2933 at QAR 820 makes 256 GB hosts normal; size memory generously, it is the cheapest headroom

Licensing

Core counts matter more

Windows per core

Each Microsoft price rise makes right-sized processors and Linux consolidation worth more; audit which VMs need Windows at all

Storage

All-flash primary

From 50 users

1.92 TB enterprise SATA SSDs at QAR 1,050 make all-flash VM storage cheaper than tiering effort; keep spinning disks for files and backup

Conclusion

Sizing a business server is arithmetic plus judgement. The arithmetic is in the table: add up the VMs, give each what it needs, add the hypervisor and 30 percent for growth, and never overcommit memory. The judgement is about availability and licensing: a 20-person office can live with one host and a good backup, a 50-person company needs two hosts and a separate backup server, and a 100-person business needs a three-node cluster with 10GbE. On refurbished Dell and HPE hardware the three designs cost about QAR 4,000, QAR 18,500 and QAR 55,000 in hardware, and the Windows licences cost as much again or more from 50 users upward, which is why the processor choice should follow the licensing plan rather than the other way round.

If your situation does not match a tier, send us the VM list or just the applications and user counts and we will size it with you. Every build in this guide is in stock in Doha and can be configured, burned in and delivered within a few days.

Tell us the headcount and the applications; we'll send a sized build and a licence plan.

ServerDove configures refurbished Dell and HPE servers in Doha for Proxmox, Hyper-V and VMware, with memory, SSDs, backup servers and 10GbE matched to the plan, and Windows Server and CAL guidance included in the quote.

Common questions

How much RAM does a server need for 50 users?

For a general office with email in Microsoft 365, about 100 GB of VM memory across eight VMs (two domain controllers, files, print, an ERP application and its SQL database, an RDS or intranet server and a utility VM), which means 128 GB per host in a two-host design so either host can run everything. Add 64 GB if Remote Desktop serves most staff, and 32 to 64 GB per additional heavy application.

How many cores do I need for 20 users?

Far fewer than a refurbished server offers. Four VMs for 20 users use 12 to 16 vCPU, which a single 12- to 20-core Xeon carries at a 3:1 consolidation ratio. The reason to limit cores is Windows licensing, which counts every physical core in 16-core packs; a single 16- or 20-core processor is the sweet spot.

Is one server enough for a small business?

Up to about 30 users with one business application, yes, provided backups are off-site and tested and a day of downtime is survivable. Beyond that, or where downtime costs money, two hosts with replication and a separate backup server are the minimum we recommend; three nodes from about 100 users or where a failure must be invisible.

How much storage per user should I plan?

20 to 50 GB per office user for files with deduplication on, 100 to 500 GB for design and media users, plus the application databases, plus 20 percent free space. Backup capacity should be 1.5 to 2 times primary data for 30 days of retention with deduplication. Put VMs and databases on SSD and files on SAS or SATA.

Do I need 10GbE?

Not for a single host serving 20 users; bonded gigabit is fine. From two hosts upward, 10GbE between the hosts and the backup server is what makes replication, live migration and nightly backups fit their windows; it needs only two NICs and a cable. At three nodes with Ceph or Storage Spaces Direct a 10GbE switch is mandatory.

What does Windows Server cost for these builds?

Windows Server 2025 Standard is about QAR 4,300 per 16 cores (USD 1,176 list) and covers two VMs per fully licensed host; Datacenter is about QAR 24,600 per 16 cores and covers unlimited VMs. Every user needs a CAL (about QAR 180) and RDS users an RDS CAL (about QAR 500). For a 50-user, two-host design with six Windows VMs per host the Standard route is roughly QAR 96,000 on 40-core hosts or QAR 70,000 on 24-core hosts, and a three-node Datacenter cluster for 100 users is about QAR 260,000, which is why processor choice should follow the licensing plan.

Should I buy new or refurbished for these sizes?

For general business workloads, refurbished 2017-generation Dell and HPE servers provide the memory capacity and core counts these builds need at a fifth to a tenth of the price of new, with three to five more years of useful life; our lifespan guide has the data. Buy new where the application vendor demands current-generation certification or where power density matters.